Duke Energy Indiana's 2024 IRP assumed a new CCGT would cost $1,100-$1,250 per kW. (image below from https://www.duke-energy.com/-/media/pdfs/for-your-home/dei-irp/2024-plan-and-attachments/vol-i-complete-2024-dei-irp-plan.pdf?rev=93f4e009ddfc44b0baa3f94f3e195b4a)
At the same time they're building a 1.5 GW combined cycle plant at over $2,200 per kW: https://www.therepublic.com/2025/02/17/duke-energy-indiana-seeks-ok-for-natural-gas-units-at-cayuga-in-3-3-billion-project/
At the same time they're building a 1.5 GW combined cycle plant at over $2,200 per kW: https://www.therepublic.com/2025/02/17/duke-energy-indiana-seeks-ok-for-natural-gas-units-at-cayuga-in-3-3-billion-project/