Funding has been secured through @pathsforall.bsky.social to make improvements on the Walkway between Powderhall Bridge and Redbraes Tunnel.
Works will include fixing the drainage path re-surfacing with KBI Flexi Pave and the installation of a handrail on the steepest section of the path.
Works will include fixing the drainage path re-surfacing with KBI Flexi Pave and the installation of a handrail on the steepest section of the path.
1 / 4
Comments
The path will be closed during this time, including evenings and overnight as the new surface requires time to cure.
Please respect the closure and use the cycle path to Steadfast gate so we get the best surface long term.