From Mary (@bocachicagal):
The sign that indicates that flight termination system installation is being performed is posted on MB2. Ship 34 is having the FTS installed before rollout for Flight 8. 🔥🚀🔥
https://nsf.live/starbase
The sign that indicates that flight termination system installation is being performed is posted on MB2. Ship 34 is having the FTS installed before rollout for Flight 8. 🔥🚀🔥
https://nsf.live/starbase
Comments
The FTS (flight termination system) for Booster 15 is already at the launch site. Booster 15 needs to be taken for a stroll very soon. Flight 8 excitement is getting real. 🔥🚀🔥