Profile avatar
spikehyena.bsky.social
23 | Hyena on the internet | Posts rail photos sometimes | Complains about work as a Rail Transportation Engineering track designer | 🏳️‍🌈
32 posts 45 followers 63 following
Regular Contributor
Conversation Starter

Tiny little first time I've ever done leather work project.

Big F40 hours.

Getting close!!!

All my trains, orange...

Can only go to mff for two days because I have to work. Literal homophobia smh...

Accidentally clicked the restart and update instead of just restart. Didn't need to get work done, nope, never

Honestly doesnt feel real that we got an entire 4000' siding extension, 2 retaining walls, and an access road all designed within like 4 months. So glad not all engineering projects go that fast though...

This is what having concrete due at 11:59pm looks like.

🦌 Back at it again with Deercember doodles! 🦌 I am going to try to do at least 15 from now until Christmas (will try for more!) If you want your OC deer'd: ✅ Be Following ❤️ Like + Repost this (Quotes acceptable? Gunna try it!) ⬇️ Give a ref sheet ⭐ Optional: Leave a light-hearted joke or meme! :)

Coolest train I've seen on this entire trip >:(

I don't need more model train projects. So anyways I want to do a n scale Altoona Works BP4. Silly 12v lead-acid battery loco will be mine.

When did it start raining????

They need to invent electric freight railroads cause I need Iowa Traction but closer.

Green bean sighting