Project #1 of 2025 (insulating a mudroom), Step 2: installed ventilation lats, cut ventilation holes.
Thought I'd have the panels up by now, but DIY projects always take 3x what's expected (little details pop up. And I made mistakes that meant rework)
Thought I'd have the panels up by now, but DIY projects always take 3x what's expected (little details pop up. And I made mistakes that meant rework)
1 / 3
Comments
-an annoying bit of plumbing, the garden faucet will need be rerun.
-Cutting the insulation sheets to size.
-One wall installed, with cutout for electric outlet!