Too bad MOT decided to change Holt to a steel span bridge, the closure and upgrades this summer are going to put a big dent in the regions bikepacking and ecotourism by not having the full loop available.
It looks like it is supposed to be completed in May. It must be frustrating for local residents who like to ride it in the winter. Going to high school in Lake Cowichan, I watched the trains go by my house on that same railway line (I'm on Salt Spring now). I hope the work finishes on time.
That’s my usual go to in the warmer months, this time of year I ride around home and in Victoria. From my house to Lake Cowichan and back doing both side of the river is almost a perfect 100k ride 👍🏼
Comments